Oct 3, 2003 1 9:00am Chi-Chi (TCU082EW) 50% in 50 Years (PGA=0.276g)
Oct 5, 2003 9:00am Chi-Chi (TCU082EW) 50% in 50 Years (PGA=0.276g)
Oct 5, 2003 3:00pm Loma Prieta (LP89g04NS) 10% in 50 Years (PGA=0.426g)
Oct 6, 2003 2 9:00am Chi-Chi (TCU082EW) 2% in 50 Years (PGA=0.622g)
Oct 6, 2003 5:00pm Chi-Chi (TCU082EW) 2% in 50 Years (PGA=0.622g)
Oct 7, 2003 3 5:00pm Loma Prieta (LP89g04NS) 10% in 50 Years (PGA=0.426g)
Oct 8, 2003 10:00am Cyclic Until Failure

Date Starting Time
(GMT+08:00)
Excitation Hazard Level
Oct 31, 2003 1:00pm Chi-Chi (TCU082EW) 10% in 50 Years (PGA=0.53g)
Nov 1, 2003 9:00am Loma Prieta (LP89g04NS) 2% in 50 Years (PGA=0.61g)
Nov 1, 2003 1:00pm Cyclic Until Failure

 


Note: A series of pseudo dynamic tests will be performed for the CFT/BRB frame by employing the networked collaborative experiment technology recently developed in NCREE. See EXPERIMENT METHOD for more information.

1 The test was interrupted due to the occurrence of buckling of a gusset plate at the first floor. [related photos]
2 The test was stopped as we found cracking of concrete near the gusset-to-concrete interface. In order to present potential out-of-plane instability of the gusset, stiffeners were added to the gusset plate.
3 In the 2/50 event test, one of the CFT column foundation slipped by 15 mm toward north direction. Cracks at the corner of the foundation block were observed. After the test, the tie downs were loosened before adding a cross beam to spread the town down force.